Asbestos Testing and Surveys in Hillsboro

Typical cost in Hillsboro

  • Testing a few materials, up to about 4 samples$300 – $600+
  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Asbestos survey before tearing down a house$800 – $2,000+

Asbestos testing tells you, before anyone cuts, whether a ceiling, floor, wall or roof contains asbestos. In Oregon only an accredited inspector can carry out the survey and write the report. We bring one in, have the materials in your work area sampled and use the lab results to plan any removal.

Hillsboro built nearly half its housing during the 1990s and 2000s. Oregon’s survey rule still covers any home built before 2004, so a house from the 1990s needs one too. We test in Hillsboro, Forest Grove and Cornelius.

Request a free quote
Labeled sample bags and a sampling tool beside a small cut in flooring

Which survey fits the job

Remodel survey

A partial renovation, such as a kitchen remodel, needs a survey of that area only. The inspector samples the materials your project will disturb, and a copy of the report must be kept at the job until the work is done.

Whole-building survey

A full demolition or an extensive renovation needs a survey of the whole structure, from roofing and siding to caulk and window glazing.

Presuming instead of testing

No lab at all is also an option: presume the material contains asbestos and handle it that way from the start. You save the wait for results and accept the stricter handling.

How samples are taken

Oregon sets minimums for what a survey samples.

One sample per material

Every suspect material gets at least one bulk sample. Sprayed or troweled surfacing, like popcorn texture, needs at least three from each area.

Layers stay separate

Since November 2018, labs cannot blend layers into one result, so each layer of a floor gets its own answer. Joint compound, tape and wallboard may be tested together as one wall system.

Owners taking their own samples

If you live in the home you are remodeling, DEQ lets you take a sample yourself. Mist the material first, take a piece about two inches square and seal it in its own container. Demolition always needs an accredited inspector.

Entry of a 1970s split-level with small taped sample spots on the ceiling, wall and floor and sealed sample bags on a step

Positive result? See popcorn ceiling removal or floor tile removal, or go back home.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (971) 260-4686

Call (971) 260-4686